The largest pharmaceutical warehouse in Poland—and one of the largest in Central Europe—has been established on King C. Gillette Street in Łódź. It is utilized by several pharmaceutical wholesalers and pharmaceutical companies that distribute medications to hospitals and pharmacies. Consequently, this facility serves as a hub from which medicines are delivered to thousands of pharmacies and hundreds of hospitals across Poland. On December 14, 2022, the final phase of the project—which had been put into operation in October of that year—was officially opened. The event was attended by the Mayor of Łódź, Hanna Zdanowska, as well as representatives from state institutions, local universities, and the organizations that financed the investment.
The project began in 2014. Over the course of these eight years, a massive undertaking—crucial for ensuring the security of medicine supplies for millions of patients in Poland—was successfully completed. On an 8.8-hectare plot, facilities spanning 43,000 square meters were constructed, providing 25,000 pallet spaces. From the very start, the investment was financed by Bank Millennium and Millennium Leasing.
The facility meets all the rigorous requirements of pharmaceutical law and Good Distribution Practice (GDP). Spanning over 43,000 square meters, it includes high-bay warehouses (exceeding 14 meters in height) and areas for storing medicinal products under controlled conditions—including those requiring a "cold chain." It also features highly secure, access-controlled storage areas for narcotic drugs, psychotropic substances, category 1 precursors, and cytostatics. This enables the company to ensure the highest standards for the safe storage of medicinal products.
By employing state-of-the-art technological solutions, a large portion of the order-fulfillment process has been fully automated, significantly streamlining and accelerating the movement of medicines from the receiving area to dispatch. As a result, patients can be confident that they will receive the medications they need in the shortest possible time.
“This investment, which began even before the extraordinary events of recent years—namely, the pandemic and the war in Ukraine—serves as a critically important link in the nationwide pharmaceutical supply chain. It provides hundreds of new jobs and contributes to the economic development of Łódź and the surrounding region,” says Jacek Szwajcowski, CEO of Pelion S.A., the parent company of the entities operating on Gillette Street in Łódź.
One of these is Urtica, which in 2016 opened the country’s largest warehouse for hospital medicines at this location. Every third medicine supplied to hospitals in Poland comes from this facility. Thanks to this investment, Urtica is able to deliver medicines anywhere in the country within 24 hours—or, via an urgent "CITO" service, within just 6 hours of receiving an order. Each month, 100,000 packages and approximately 5,000 pallets are dispatched from the warehouse.
The new Pharmalink warehouse—one of the tenants in the most recently completed building—spans over 4,500 sqm and provides storage capacity for more than 5,800 pallets at a temperature range of 15–25°C. The facility also includes cold storage units capable of holding over 350 pallets at a temperature range of 2–8°C. In addition to storing products across these two temperature ranges, Pharmalink has a dedicated, secure storage area for controlled substances, with a capacity of over 100 pallet positions.
“Thanks to the new warehouse space—equipped with high-bay racking, shelving units, and modern infrastructure—Pharmalink will deliver an even higher standard of distribution services and secure the capacity for growth for years to come,” emphasizes Renata Biel, CEO of the company.
The Mayor of Łódź, who was present at the opening, highlights the significance of the investment for Łódź and the region.
“This investment strengthens our region’s resilience—not only in terms of healthcare but also economically. It means new jobs, and with them, a stable future for hundreds of families. It also means tax revenue for our city, which will help fund ambitious programs for the people of Łódź. As the Mayor of Łódź, I am delighted that, even as its scale of operations continues to grow, Pelion has chosen Łódź as the location for its most significant investments,” says Hanna Zdanowska.
Importantly, a strong emphasis was placed on eco-friendly solutions from the very beginning of the construction process. The facility was built in compliance with environmental protection and water management regulations. Prefabricated components were used, along with materials and equipment that hold technical approvals and are certified for use within the EU market. From an environmental perspective, the use of existing technical infrastructure—allowing for connection to established utility networks—was particularly significant. Given the proximity of residential areas, measures were taken to minimize noise: loading bridges with sound-dampening features were installed, and air-conditioning and power-generation units were selected in low-noise versions. Gas-powered heating and cooling systems were chosen over electric alternatives. Heat pumps are used to heat the offices and regulate the temperature in the warehouse areas; some of these systems also allow for heat recovery for domestic hot water. An underground retention tank was constructed to collect rainwater, which is then used for sanitary purposes and irrigation of the green spaces. Additionally, photovoltaic panels have been installed on the roof of the newest warehouse hall.